Sequence Number in Move Summary
Bring back the sequence number in the move summary! I.e. 1.001 to denote phase 1 move 1. The Move ID of a string of random numbers without any methodology makes it incredibly difficult to interpret and use

-
Glenn Turnham commented
Hi Yvette, unfortunately this does not help. We need to be able to see in which order the moves where made so if we are required to undo or delete the last move made, we can see in chronological and sequential order (like in V2) and go to the last move in the sequence and delete. The most recent move made now in V3 appears somewhere randomly in the list, rather than at the bottom of the list. The The phase column does not help as this was always there previously, but with move information in the form of a sequence number i.e. 2.043 (phase 2 move 43).
-
yvette.koumides@eptura.com commented
Hi Glenn.
I liked this too - however I hope the inclusion of the Phase column on the Summary screen is helpful in the meantime. All moves in Phase 1 happen simultaneously, regardless of the exact order in which you performed them in the Scenario VBS. Same with all moves in Phase 2, all moves in Phase 3, etc.
Yvette