PM Scheduling have an active and inactive flag to turn schedules off or on
PM Scheduling. The ability to have and active and in active flag on a PM Schedule to suspend the generation of the PM. this is currently only able to be done by changing frequency interval to mismatch with the current frequency or modify the frequency to no fall into any possible generation period.
7
votes
